Councils
Estate-wide fabric programmes across schools, housing and operational buildings. SHDF and decarbonisation delivery with conformity and social-value reporting.


Cavity, Loft & Internal Wall, Councils, HAs & Frameworks
Fabric-first insulation for social and commercial stock, with suitability inspection, trained installers and conformity documentation, not badge lists.
B2B Enquiry
For commercial, social-housing and framework enquiries. We'll respond from the commercial team.
Who We Work With
Insulation retrofit programmes for buyers who need framework-grade suitability, supervision and conformity records, not a homeowner-style brochure.
Estate-wide fabric programmes across schools, housing and operational buildings. SHDF and decarbonisation delivery with conformity and social-value reporting.
Portfolio cavity, loft and IWI rollouts across social-housing stock, with resident comms, suitability documentation and completion records.
Insulation works across managed estates, coordinated with planned maintenance windows, access constraints and tenant operations.
Subcontract fabric and retrofit scope delivered to programme, with RAMS, ITPs, supervision and snagging discipline expected on tier-one sites.
Industrial, warehouse, office and mixed-use stock, fabric upgrades with suitability inspection and documented conformity on completion.
Rural housing stock and farm dwellings, loft, cavity and IWI programmes with access planning and conformity handover.
Why It Matters
Procurement needs inspection criteria, installer competence and conformity records, not accreditation logos alone. Every claim is evidenced per project.
The measure that does most for warmth and carbon when done correctly.
Pre-install inspection criteria and clear exclusions, so measures suit the property.
Installer training and conformity documentation shown, not just accreditation logos.
Scope
Cavity, loft and internal wall insulation delivered with pre-install suitability, trained installers and per-measure conformity records.
Suitability-inspected installs to standard.
Removal of failed insulation and re-fill where appropriate.
Top-up or full, with eaves ventilation maintained.
Design-stage risk control, thermal-bridge management and on-site supervision.
Pre-install criteria and exclusions documented.
Per-measure conformity records and lodgement.
Mobilisation & Delivery
Portfolio surveys, suitability, design, programme, RAMS and site supervision, all run as one programme under framework agreements.
Pre-install criteria, exclusions, damp and ventilation flags documented before work proceeds.
Measure selection, RdSAP alignment, IWI design controls and thermal-bridge management.
Framework programme, resident comms, access coordination, RAMS, ITPs and site induction.
Trained installers, on-site supervision, ITPs and thermal-bridge checks, especially on IWI delivery.
KPIs & Reporting
Buyers see what's happening on programme, on H&S, on quality, on conformity records and on social value, in formats their boards and panels expect.
Weekly programme reporting against the agreed schedule, with early-warning of risk.
RAMS, ITPs, permits, induction and incident reporting documented and shared.
Snag list management with closure evidence, photo records and sign-off.
PAS 2030 conformity records, TrustMark lodgement evidence and handover packs per measure.
Project-level carbon reporting in the buyer's format. Claims evidenced, not generic.
Local jobs, apprenticeships, supply chain and community benefit reported per project.
Compliance
The diligence pack, up front. Renewal dates published so your procurement team isn't chasing.
For cavity insulation, we document inspection criteria and exclusions before install. For internal wall insulation, design-stage risk control, thermal-bridge management and installer competence are the delivery-risk differentiator. PAS 2030 conformity and TrustMark lodgement are completed per measure, claims evidenced per project.
| Accreditation / Insurance | Status | Cover | Renewal |
|---|---|---|---|
| PAS 2030 Certification (Insulation) | Active | - | |
| TrustMark Registration | Active | - | |
| Public / Product Liability Insurance | Active | £5,000,000 | |
| Employers' Liability Insurance | Active | £10,000,000 | |
| Professional Indemnity | Active | £2,000,000 | |
| Insurance-Backed Guarantee Provider | Active | - | |
| CHAS / SafeContractor (or equivalent) | On request | - | |
| ISO 9001 / 14001 / 45001 | On request | - |
Social Value
Social value isn't an afterthought. It's agreed up front against your framework's measures and reported on completion, with the evidence to back it up.
We hire, train and supply from the local economy on framework projects.
Apprentice involvement on installs where the programme allows, supporting the next generation of installers.
Preferential use of regional suppliers, scaffold and access partners.
Community-facing actions agreed up front with the buyer, reported on completion.
Case Studies
Selected insulation retrofit and framework projects with scope, risks managed and outcomes. [Add real projects with before/after photos, scope notes and buyer outcomes.]
[Sector] - [Location] - [Scope]
[Scope, suitability, conformity records, programme adherence. Replace with real project content.]
[Sector] - [Location] - [Scope]
[Scope, suitability, conformity records, programme adherence. Replace with real project content.]
[Sector] - [Location] - [Scope]
[Scope, suitability, conformity records, programme adherence. Replace with real project content.]
Funding & Programme Routes
Insulation retrofit programmes can be delivered under direct procurement, ECO or SHDF funding routes, or through an existing framework agreement. Scope and funding structure are confirmed in writing per project.
Buyer-funded programme with written scope, suitability criteria and conformity records per property.
Funded or part-funded routes where eligibility and measure suitability are documented before install.
Call-off delivery under an existing framework with programme reporting and conformity handover.
Portfolio or property-level survey, pre-install criteria, exclusions and damp/ventilation checks documented.
Measure selection, IWI design controls and thermal-bridge management, written specification per property.
Trained installers, RAMS, ITPs, on-site supervision, especially IWI delivery risk.
PAS 2030 conformity records, TrustMark lodgement, handover pack and sign-off to the buyer.
Trust & Track Record
"CRS ran our loft and cavity programme across the estate with documented suitability checks on every property, exclusions were flagged early, not after install."
"Mobilised quickly under our framework, coordinated access with our FM team and handed over conformity records without us chasing."
"The IWI specification included thermal-bridge detail and supervision records we could actually use at panel. That was the differentiator."
FAQ
For commercial, social-housing and framework enquiries. Or call 0800 009 2992.
Capability Statement and Accreditation Pack available on request.